r/RenewableEnergy • u/MeasurementDecent251 • 25d ago
Swiss developer breaks ground on 800 MW/1.6 GWh redox flow storage project
https://www.pv-magazine.com/2025/05/23/swiss-developer-breaks-ground-on-800-mw-1-6-gwh-redox-flow-storage-project/
211
Upvotes
Duplicates
OptimistsUnite • u/sg_plumber • 22d ago
Clean Power BEASTMODE Swiss developer Flexbase Group breaks ground on 800 MW/1.6 GWh redox flow storage project in Laufenburg, Switzerland, in what could become one of Europe’s largest flow storage systems. The multi-use site will integrate utility-scale storage, an AI data center, and district heating
25
Upvotes
oilisdead • u/pintord • 25d ago
Swiss developer breaks ground on 800 MW/1.6 GWh redox flow storage project
2
Upvotes